2 Park Place, Cork (Ireland)

Content

Client
Cyber security – global leader

Project
Phase 1 of a Category B fit out in a corporate technical support centre. The project required a new main equipment room to be built and around 1,200 Category 6 data points installed, along with a bespoke, fully-integrated, AV system incorporating projectors and screens in three conference rooms, two meeting rooms, a training room and the reception area.

Duration
Eight weeks

Our role
Consultancy
Installation

Key points

  • Cat B fit out (Phase 1)
  • Build a new MER with inter-cabinet / rack links
  • Install c.1,200 Cat 6 data points
  • Supply and install integrated AV system
  • Design liaison and installation coordination with the main contractor