7 Prince’s Street, London

Client
Global market-leader in cyber security

Project
A Category B fit out requiring a fast preconstruction design. Install a new secondary equipment room, 800(+) Category 6 data points along with an integrated AV system (projectors and LCD screens) in three meeting rooms, two board rooms and the reception area.

Duration
Three weeks

Our role
Installation

Key points

  • Install new SER
  • Install 800(+) Cat 6 data points
  • Install inter-cabinet /rack links within the SER
  • Install multi-room AV system
  • Design liaison and installation coordination with the main contractor