7 Soho Square, London

Client
Worldwide, market-leading travel company

Project
A Category B fit out across two floors of an existing office complex involving the installation of 800 Category 6 data points and cabling to a secondary equipment room on each floor. We worked with the client’s IT team in Boston, Massachusetts, to ensure the design fully met their expectations and requirements.

Duration
Six weeks

Our role
Consultancy
Installation

Key points

  • Cat B fit out in an existing building
  • Two new SERs
  • 800x Cat 6 data points
  • Transcontinental design liaison
  • Design liaison and integration with the main contractor