g2admin

6th September 2019

UK’s leading tourist attractions London

Client
Leading London based Estate management company.

Project
Category A and Category B fit out in the View From The Shard’s ground floor entrance and reception area and the viewing galleries at the top of the tallest building in both the UK and EU. Install a blown-fibre backbone from three secondary equipment rooms located on the 1st, 50th and 70th floors down to a minimum point of entry room in the basement. Install 300(+) Category 6a data points and cabling in the public viewing galleries on the 70th, 71st and 72nd floors.

6th September 2019

1 Sheldon Square London

Client
Global payments technology company

Project
Upgrade an analogue CCTV system to a digital IP solution in a 190,000sqft office complex including the building’s perimeter. Carry out a live ‘hot swap’ of security cameras and install 200(+) Category 6 data points, backbone cabling to secondary equipment rooms and secondary containment.

6th September 2019

Canterbury College Canterbury

Client
Canterbury College

Project
Manage and install the IT infrastructure throughout the college campus during a five-year rebuilding programme, including Category A and Category B fit outs in seven new buildings. The principal challenge was to keep the college IT network fully operational during the relocation of the main equipment room while each block was either renovated or built. The project was a major undertaking with an overall contract value worth around £40m to the main contractor, Wates Construction.

4th September 2019

ISO Standards

We are delighted to announce that following 6-months of dedication, hard work & cooperation on behalf of our staff, we have recently achieved one of […]
17th August 2016

2 Park Place, Cork (Ireland)

Client
Cyber security – global leader

Project
Phase 1 of a Category B fit out in a corporate technical support centre. The project required a new main equipment room to be built and around 1,200 Category 6 data points installed, along with a bespoke, fully-integrated, AV system incorporating projectors and screens in three conference rooms, two meeting rooms, a training room and the reception area.

17th August 2016

7 Prince’s Street, London

Client
Global market-leader in cyber security

Project
A Category B fit out requiring a fast preconstruction design. Install a new secondary equipment room, 800(+) Category 6 data points along with an integrated AV system (projectors and LCD screens) in three meeting rooms, two board rooms and the reception area.

17th August 2016

The Shard Arcade London

Client
Leading London based Estate management company.

Project
Category B fit-out in a new, 15-unit, high-end retail development. Installation of a Prysmian fibre solution and copper backbone. All units connected back to both intake rooms. The project had to be completed within a short ‘window of availability’ during the fit-out timetable to ensure the units could be handed over, occupied and opened as quickly as possible.

17th August 2016

The Shard: Levels 1 & 3 London

Client
Leading London based Estate management company.

Project
Category B fit out throughout a new, two-storey office complex involving the installation of over 500 Category 6a data points and cabling to a main equipment room. The project required greater care than normal as the cable ducts were beneath an expensive, Italian marble floor.

17th August 2016

Basingstoke Data Centre, Basingstoke

Client
Global payments technology company

Project
Upgrade an analogue CCTV system to a digital IP solution throughout multiple data halls. Carry out a live ‘hot swap’ of over 100 security cameras with multiple secondary equipment rooms, a single-mode fibre network, ‘pit work’ for perimeter cameras and accommodate multiple IT change freezes during the project. Provide an extensive fibre backbone along with Category 6 cabling and data points.

17th August 2016

Earlham Street, London

Client
Worldwide social media company

Project
A Category B fit out in the UK headquarters of a US corporate organisation. The project involved redesigning the main equipment room and upgrading and extending the existing Category 6 structured cabling system to bring it in line with the company’s global telecommunications standards. The offices complex occupied five floors, each floor presented a unique design challenge to meet the agreed specification.

17th August 2016

7 Soho Square, London

Client
Worldwide, market-leading travel company

Project
A Category B fit out across two floors of an existing office complex involving the installation of 800 Category 6 data points and cabling to a secondary equipment room on each floor. We worked with the client’s IT team in Boston, Massachusetts, to ensure the design fully met their expectations and requirements.

17th August 2015

Fletcher House, Oxford

Client
Global, market-leading travel advice company

Project
A Category B fit out across two floors of the company’s divisional headquarter’s building. The project involved the installation of new main and secondary equipment rooms along with over 500 Category 6 data points. As with a previous project, we worked closely with the client’s IT team in Boston, Massachusetts, to ensure the design fully met their requirements.