Portfolio (test2)

17th August 2010

Reading International BP, Reading

Client
Cyber security – global leader

Project
Category B fit out in an EMEA headquarters building for a global corporation. Install c.800 Category 6 data points and an integrated AV system in seven meeting rooms, a training room and the reception area.

17th August 2011

Jumeirah Lake Towers, Dubai (UAE)

Client
Cyber security – global leader

Project
Design the structured cabling infrastructure in a Middle-Eastern headquarters building to ensure compliance with the corporation’s global IT standards. Oversee the local contractors undertaking the building of a new main equipment room and installing c.280 Category 6 data points to ensure their work and the finished installation met the specification standards expected.

17th August 2012

Wallstrasse 1A, Dresden (Germany)

Client
Cyber security – global leader

Project
Category B fit out in a new extension at a European research and development centre. Install c.300 Category 6 data points and link them to the centre’s main equipment room. Install a 90-inch presentation screen along with projectors and LCD screens in a conference room, two meeting rooms and reception area.

17th August 2013

Hinshelwood Building, Oxford

Client
Global holiday-lettings company

Project
Category B fit out throughout a 31,500sqft, two-storey office block. Build new main and secondary equipment rooms and install c.1,000 Category 6 data points. This project was for a subsidiary of a long-standing client and, as with previous projects for the client, we worked closely with their IT team in Boston, Massachusetts, to ensure the design fully met their requirements.

17th August 2014

10 Brock Street, London

Client
Global corporation – social media

Project
Category B fit out of a 100,000sqft corporate UK-headquarters building. Install new main and secondary equipment rooms and over 3,000 Category 6 data points: this was achieved within a two week time frame to meet telecommunication standards. A separate AV network was also installed and integrated with an AV control room.

17th August 2015

Fletcher House, Oxford

Client
Global, market-leading travel advice company

Project
A Category B fit out across two floors of the company’s divisional headquarter’s building. The project involved the installation of new main and secondary equipment rooms along with over 500 Category 6 data points. As with a previous project, we worked closely with the client’s IT team in Boston, Massachusetts, to ensure the design fully met their requirements.

17th August 2016

7 Soho Square, London

Client
Worldwide, market-leading travel company

Project
A Category B fit out across two floors of an existing office complex involving the installation of 800 Category 6 data points and cabling to a secondary equipment room on each floor. We worked with the client’s IT team in Boston, Massachusetts, to ensure the design fully met their expectations and requirements.

17th August 2016

Earlham Street, London

Client
Worldwide social media company

Project
A Category B fit out in the UK headquarters of a US corporate organisation. The project involved redesigning the main equipment room and upgrading and extending the existing Category 6 structured cabling system to bring it in line with the company’s global telecommunications standards. The offices complex occupied five floors, each floor presented a unique design challenge to meet the agreed specification.

17th August 2016

Basingstoke Data Centre, Basingstoke

Client
Global payments technology company

Project
Upgrade an analogue CCTV system to a digital IP solution throughout multiple data halls. Carry out a live ‘hot swap’ of over 100 security cameras with multiple secondary equipment rooms, a single-mode fibre network, ‘pit work’ for perimeter cameras and accommodate multiple IT change freezes during the project. Provide an extensive fibre backbone along with Category 6 cabling and data points.

17th August 2016

The Shard: Levels 1 & 3 London

Client
Leading London based Estate management company.

Project
Category B fit out throughout a new, two-storey office complex involving the installation of over 500 Category 6a data points and cabling to a main equipment room. The project required greater care than normal as the cable ducts were beneath an expensive, Italian marble floor.

17th August 2016

The Shard Arcade London

Client
Leading London based Estate management company.

Project
Category B fit-out in a new, 15-unit, high-end retail development. Installation of a Prysmian fibre solution and copper backbone. All units connected back to both intake rooms. The project had to be completed within a short ‘window of availability’ during the fit-out timetable to ensure the units could be handed over, occupied and opened as quickly as possible.

17th August 2016

7 Prince’s Street, London

Client
Global market-leader in cyber security

Project
A Category B fit out requiring a fast preconstruction design. Install a new secondary equipment room, 800(+) Category 6 data points along with an integrated AV system (projectors and LCD screens) in three meeting rooms, two board rooms and the reception area.