10 Brock Street, London

Client
Global corporation – social media

Project
Category B fit out of a 100,000sqft corporate UK-headquarters building. Install new main and secondary equipment rooms and over 3,000 Category 6 data points: this was achieved within a two week time frame to meet telecommunication standards. A separate AV network was also installed and integrated with an AV control room.

Duration
Six weeks

Our role
Installation

Key points

  • Cat B fit out
  • Build new MER and SER
  • Install over 1,100m of multi-mode OM3 fibre-optic cable
  • Install c.3,000 Cat 6 data points
  • Design liaison and installation coordination with the main contractor