Client
Global holiday-lettings company
Project
Category B fit out throughout a 31,500sqft, two-storey office block. Build new main and secondary equipment rooms and install c.1,000 Category 6 data points. This project was for a subsidiary of a long-standing client and, as with previous projects for the client, we worked closely with their IT team in Boston, Massachusetts, to ensure the design fully met their requirements.
Duration
Eight weeks
Our role
Consultancy
Installation
Key points