Welcome to Trans Comms
Trans Comms is an industry-leading communications company, consultancy and resource provider. We design, install and manage structured cabling infrastructure, IT and audio-visual solutions and both conventional and specialist electrical power systems.
Using the technical expertise, practical experience and commercial understanding we’ve gained since 2004, we’ll translate your needs into a design concept and develop this into a fully functional solution. We can also provide you with ongoing support and offer technical expertise on a contract basis.
Case Studies
Our clients benefit from technologically efficient and innovative solutions that provide them with a practical and dependable IT infrastructure and state-of-the art power systems, solutions that can be relied on to support their operations both today and in the future.

Canterbury College
Canterbury
Client
Canterbury College
Project
Manage and install the IT infrastructure throughout the college campus during a five-year rebuilding programme, including Category A and Category B fit outs in seven new buildings. The principal challenge was to keep the college IT network fully operational during the relocation of the main equipment room while each block was either renovated or built. The project was a major undertaking with an overall contract value worth around £40m to the main contractor, Wates Construction.


7 Soho Square
London
Client
Worldwide, market-leading travel company
Project
A Category B fit out across two floors of an existing office complex involving the installation of 800 Category 6 data points and cabling to a secondary equipment room on each floor. We worked with the client’s IT team in Boston, Massachusetts, to ensure the design fully met their expectations and requirements.


Earlham Street
London
Client
Worldwide social media company
Project
A Category B fit out in the UK headquarters of a US corporate organisation. The project involved redesigning the main equipment room and upgrading and extending the existing Category 6 structured cabling system to bring it in line with the company’s global telecommunications standards. The offices complex occupied five floors, each floor presented a unique design challenge to meet the agreed specification.


1 Sheldon Square
London
Client
Global payments technology company
Project
Upgrade an analogue CCTV system to a digital IP solution in a 190,000sqft office complex including the building’s perimeter. Carry out a live ‘hot swap’ of security cameras and install 200(+) Category 6 data points, backbone cabling to secondary equipment rooms and secondary containment.


The Shard Arcade
London
Client
Leading London based Estate management company.
Project
Category B fit-out in a new, 15-unit, high-end retail development. Installation of a Prysmian fibre solution and copper backbone. All units connected back to both intake rooms. The project had to be completed within a short ‘window of availability’ during the fit-out timetable to ensure the units could be handed over, occupied and opened as quickly as possible.


Basingstoke Data Centre
Basingstoke
Client
Global payments technology company
Project
Upgrade an analogue CCTV system to a digital IP solution throughout multiple data halls. Carry out a live ‘hot swap’ of over 100 security cameras with multiple secondary equipment rooms, a single-mode fibre network, ‘pit work’ for perimeter cameras and accommodate multiple IT change freezes during the project. Provide an extensive fibre backbone along with Category 6 cabling and data points.


The Shard: Levels 1 & 3
London
Client
Leading London based Estate management company.
Project
Category B fit out throughout a new, two-storey office complex involving the installation of over 500 Category 6a data points and cabling to a main equipment room. The project required greater care than normal as the cable ducts were beneath an expensive, Italian marble floor.


UK's leading tourist attractions
London
Client
Leading London based Estate management company.
Project
Category A and Category B fit out in the View From The Shard’s ground floor entrance and reception area and the viewing galleries at the top of the tallest building in both the UK and EU. Install a blown-fibre backbone from three secondary equipment rooms located on the 1st, 50th and 70th floors down to a minimum point of entry room in the basement. Install 300(+) Category 6a data points and cabling in the public viewing galleries on the 70th, 71st and 72nd floors.


7 Prince’s Street
London
Client
Global market-leader in cyber security
Project
A Category B fit out requiring a fast preconstruction design. Install a new secondary equipment room, 800(+) Category 6 data points along with an integrated AV system (projectors and LCD screens) in three meeting rooms, two board rooms and the reception area.


2 Park Place (Phase 1)
Cork, Ireland
Client
Cyber security – global leader
Project
Phase 1 of a Category B fit out in a corporate technical support centre. The project required a new main equipment room to be built and around 1,200 Category 6 data points installed, along with a bespoke, fully-integrated, AV system incorporating projectors and screens in three conference rooms, two meeting rooms, a training room and the reception area.


Fletcher House
Oxford
Client
Global, market-leading travel advice company
Project
A Category B fit out across two floors of the company’s divisional headquarter’s building. The project involved the installation of new main and secondary equipment rooms along with over 500 Category 6 data points. As with a previous project, we worked closely with the client’s IT team in Boston, Massachusetts, to ensure the design fully met their requirements.


10 Brock Street
London
Client
Global corporation – social media
Project
Category B fit out of a 100,000sqft corporate UK-headquarters building. Install new main and secondary equipment rooms and over 3,000 Category 6 data points: this was achieved within a two week time frame to meet telecommunication standards. A separate AV network was also installed and integrated with an AV control room.


Hinshelwood Building
Oxford
Client
Global holiday-lettings company
Project
Category B fit out throughout a 31,500sqft, two-storey office block. Build new main and secondary equipment rooms and install c.1,000 Category 6 data points. This project was for a subsidiary of a long-standing client and, as with previous projects for the client, we worked closely with their IT team in Boston, Massachusetts, to ensure the design fully met their requirements.


Wallstrasse 1a
Dresden, Germany
Client
Cyber security – global leader
Project
Category B fit out in a new extension at a European research and development centre. Install c.300 Category 6 data points and link them to the centre’s main equipment room. Install a 90-inch presentation screen along with projectors and LCD screens in a conference room, two meeting rooms and reception area.


Jumeirah Lake Towers
Dubai, UAE
Client
Cyber security – global leader
Project
Design the structured cabling infrastructure in a Middle-Eastern headquarters building to ensure compliance with the corporation’s global IT standards. Oversee the local contractors undertaking the building of a new main equipment room and installing c.280 Category 6 data points to ensure their work and the finished installation met the specification standards expected.


Reading International Business Park
Reading
Client
Cyber security – global leader
Project
Category B fit out in an EMEA headquarters building for a global corporation. Install c.800 Category 6 data points and an integrated AV system in seven meeting rooms, a training room and the reception area.

Friedrichstrasse
Berlin, Germany
Client
Global online travel company
Project
Install c.60 Category 6 data points in a new office area, the installation being carried out at very short notice, the network being needed ‘immediately’. Because of our long-term relationship with the client we knew and understood their global specification so could act immediately and be confident that we would meet their expectation.