The Shard: Levels 1 & 3 London

Client
Leading London based Estate management company.

Project
Category B fit out throughout a new, two-storey office complex involving the installation of over 500 Category 6a data points and cabling to a main equipment room. The project required greater care than normal as the cable ducts were beneath an expensive, Italian marble floor.

Duration
17 weeks

Our role
Installation

Key points

  • Cat B fit out on a high-profile site
  • Install 500 Cat 6a data points
  • 90% of cable pathways under Italian marble flooring
  • Design coordination with consultant and main contractor