Client
LLeading London based Estate management company.
Project
Category A and Category B fit out in the View From The Shard’s ground floor entrance and reception area and the viewing galleries at the top of the tallest building in both the UK and EU. Install a blown-fibre backbone from three secondary equipment rooms located on the 1st, 50th and 70th floors down to a minimum point of entry room in the basement. Install 300(+) Category 6a data points and cabling in the public viewing galleries on the 70th, 71st and 72nd floors.
Duration
Three weeks
Our role
Installation
Key points